Panzo

Run projects, cash flow and aftercare in one place.

The workspace for interior-design and modular-furniture firms — leads to handover to post-handover service.

© Panzo

Panzo

Welcome Back

Sign in to your workspace to pick up where you left off.

Forgot Password?

Accounts are provisioned by your administrator.

From The Industry
48%Half of all rework traces back to bad information

Poor project data and miscommunication caused 48% of all rework in US construction — about $31.3B in a single year. Poor communication alone accounted for $17B of it.

Most rework isn't a craftsmanship failure. Someone built exactly what they were told, from information that was already out of date.

FMI / Autodesk, Construction Disconnected, 2018

From The Industry
48%Half of all rework traces back to bad information

Poor project data and miscommunication caused 48% of all rework in US construction — about $31.3B in a single year. Poor communication alone accounted for $17B of it.

Most rework isn't a craftsmanship failure. Someone built exactly what they were told, from information that was already out of date.

FMI / Autodesk, Construction Disconnected, 2018